Home > Products > Coupling Transform > Coupling R15K551.1 > Technical Transformation for Energy Saving for Power Plant

Technical Transformation for Energy Saving for Power Plant

Payment Type:
L/C,T/T
Incoterm:
FOB,CFR,CIF
Min. Order:
1 Set/Sets
Transportation:
Ocean,Land,Air
Port:
Dalian
Share:
  • Product Description
Overview
Product Attributes

Model No.R15K551.1-5

Standard or NonstandardStandard

Surface TreatmentCarburizing And Quenching

MaterialAlloy

Supply Ability & Additional Information

Packagingwooden case

Productivity1000

TransportationOcean,Land,Air

Place of OriginChina

Supply Ability10000

PortDalian

Payment TypeL/C,T/T

IncotermFOB,CFR,CIF

Packaging & Delivery
Selling Units:
Set/Sets
Package Type:
wooden case

Technical Transformation for Energy Saving For Power Plant -----R15K551.1             ** High-Speed Ebara Coupling ** Ebara Coupling **

Transformation Plan R15K551.1 :                     ** Reliable Ebara Coupling ** Rigid Coupling **

First, take out the gear lubricating pump and the centrifugal working oil pump from the coupling.     ** Voith Coupling ** Voith Turbo Coupling **

Take out the pump wheel and turbine wheel. Add a set of new designed gear coupling ( our patented product ) instead. Add a new set of lubricating system with gear oil pump, Take out original working oil system and transform the lubricating system. Keep all parameters same as original, after techanical transformation, average annual load is about 75%. The average electricity saving ratio is at least 23%. It could declined the station service power consumption ratio about 0.65.

** Coupling for Maintenance ** Coupling Maintenance **

Technical Transformation of Power Plant Equipment

Old Equipment Upgrade / Booster pump

Old Equipment Replacement

Our company: Shenyang German Machine Hydraulic Transmission Machinery Co., Ltd. is located in the center of China industry base, Northeast of China. We engaged in Energy Saving Project for thermal power plant of 200WM, 300MW, 330MW and  600MW, we have over ten years experience in this project, and have well finished more than 20 projects in China, to cut down the cost for about 23--25% for power plants. 

Besides, we also provide technical service for power plant Couplings , pumps, and all kinds of spare parts for booster pump, boiler feed water pump, couplings, especially for Voith couplings.

If you are interested in this energy saving project, please don't hesitate to contact us, we will give you a professional suggestion for your power plant.


With the foundation of honest operation and responsibility of helping the customer settle the problem in time, our company gained great horner in the customers of construction machinery industry. 

We insist on the principle of customer first, with the quickest supply speed and time, perfect quoting system and rapid delivery method, our company can settle the problem in shortest time to reduce the cost for client. 


Delivery Time: Nomally 30 days after receiving the prepayment, subject to the volume of the practical order.


inspection
We have the chemical elements analysis centre and the mechanical testing centre
which include the following quality control measures:
Spectrographic analysis, magnaflux crack detection, ultrasonic detection, dynamic
fatigue testing hardness testing, proof and ultimate breaking strength test...
TUV DIN EN ISO 9001: 2000 & ISO/TS16949 available  



Packing and Shipping 
Our products are all packed in wooden cases to ensure zero damage. If customers
have specific requirements for the packaging, we will gladly accommodate. The products
will be sent to you within 30 days and we will arrange everything from the initial consultation
to the delivery of your chosen port anywhere the world.

Advantages:

1) Superior quality guaranteed

2) Competitive and reasonable price

3) Long lasting and reliable working life time

4) Fast lead time

5) Able to produce according to specification with control

6) Packing according to specifications required

7) Positive client feedback in abroad and domestic markets

8) Professional manufacture and offer the best serve

Our Serve:

1) Experienced engineers answer all your questions

2) Customized design is available

3) Offer surveying and mapping at site



Product Categories : Coupling Transform > Coupling R15K551.1

Home > Products > Coupling Transform > Coupling R15K551.1 > Technical Transformation for Energy Saving for Power Plant
Email to this supplier
  • *Subject:
  • *To:
    Ms. Olivia
  • *Email:
  • *Message:
    Your message must be between 20-8000 characters
Send Inquiry
*
*

Related Products List

Home

Product

Phone

About Us

Inquiry

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send